PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed copper pipes above the cealing at the 1st Floor Facing North (800x600).jpg Installing copper piping at the 1st Floor Facing West (800x600).jpg Installing the main Sprinkler pipe at the 1st Floor Facing West (800x600).jpg Started installing top metal track at the 4th Floor Facing East (800x600).jpg Unloaded duct work for the 2nd Floor Facing South (800x600).jpg Welded clips along the column at the 2nd floor (North Elevation) (1) (600x800).jpg Welded clips along the column at the 2nd floor (North Elevation) (2) (600x800).jpg Welding clips along the column at the 2nd Floor  West Elevation (800x600).jpg Installed conduit all the way up to the 4th Electrical Room 469 Facing South (800x600).jpg
Previous pageNext page Unloaded duct work for the 2nd Floor Facing South (800x600)
Unloaded duct work for the 2nd Floor Facing South (800x600)